5/8/2022 - There wasn't much visible change from the last video, but I did see that the sewer line was finished. Once they have installed the stairs, we will be able to get video of the progress in the basement. The next drone footage will be after the exterior starts to get wrapped and the roof installed. Quality of construction is one of the best that I have seen in a while.
4/24/2022 - The rough framing has been completed. The quality of materials and workmanship appear to be very good. The exterior walls have been built using 2x6 construction on 2 foot centers. The interior walls have been built with 2x4 construction on 18 inch centers. The next step would be drying in the home, which will consist of wrapping the exterior with a water resistant material, installing the roofing material, and installing the windows and exterior doors. The next video will be taken after dry-in is completed.
4/10/2022 - The rough framing has begun.
3/13/2022 - This is the first of many updates regarding your new home in Meridian Ranch. The foundation is complete and Framing should be starting soon. The next update will be during/after the rough framing is finished.